Project Overview

Brief description of the scheme: The scheme involved the addition of an Early Years Unit constructed within the grounds of the existing school.

The entire build period for the scheme was 20 weeks and involved the construction of a new single storey facility which included classrooms and an outdoor soft play area.

Additional information: Use of a recycled timber dry stack walling system accelerated the superstructure build with the structural walls constructed in just two weeks. The walls were then clad with a stone render. Key features of the building were sunpipes throughout the building to provide natural lighting, a sprinkler system, underfloor heating and a surface water attenuation system. Surplus excavated materials were used to make up levels and flatten off existing football field.

During construction work the site was accessed via a separate road to minimise disruption to the rest of the school.

The project was completed on time and within budget and was handed over in time for the start of the new academic year.

Rushcliffe School

A new build, design and build, 2,200m2 Performing Arts and Languages Building at the Ofsted Outstanding school.

Witham St. Hughs Academy

Working within a live site in a new residential area, we undertook the construction of a predominantly timber framed extension to the existing school. 

Research Acceleration Demonstration Building

Known as the Research Acceleration and Demonstration (RAD) building, the 2500m2 centre, is being delivered on the University of Nottingham’s Jubilee Campus, 

Bishop Grosseteste University Phase 1

A significant element of the project was the installation of new structural steel to open up the building by removing structural walls. 

De Montfort University – Castle Hall Business School

The team behind the transformation of Leicester Castle into a leading business school have described the challenge and excitement of bringing such a historic building back to life.  

Loughborough University – Multi Faith Centre

Refurbishment and remodeling of the Edward Herbert Building first floor at Loughborough university saw Woodhead deliver :  a Christian Chapel, Multi-faith prayer rooms, male and female Muslim prayer rooms.

ST JOHNS COLLEGE, CARDIFF

A St John’s College is an independent day school for boys and girls aged 3 to 18. This project involved the construction of a new extension for the provision of new classroom space and library facilities.

 

BRYNCETHIN PRIMARY SCHOOL, BRIDGEND

Total Regeneration has an unrivalled understanding of planning and development opportunities nationwide, including local knowledge of the long term, publicly funded development areas

Let's Build Together

Please complete the form below and someone from the Total Regeneration team will be in touch.

Let’s talk

0333 5330 032

DIVISIONS

INDUSTRIES

Follow Us

©2012-2022 All rights reserved you must not copy any content on this website without the written consent of the Total Regeneration Group

Part of the Total Regeneration Group

Scroll to Top