ST MODWEN PROPERTIES PLC – NEW-BUILD MEASE SPENCER ACADEMY

Total worked with Leicestershire County Council to construct a range of high-spec steel frame industrial units ranging from 1,570 to 33,360 sq. ft, to create additional space at the existing Airfield Business Park. This highly energy efficient project was awarded Project of the Year at the East Midlands Energy Efficiency Awards 2020.

New-build-academy-TOTAL-GROUP.png

Project details:

Client:  St Modwen’s

Team:  Total Group

Type: JCT Design & Build Contract

Location: Derbyshire

Project value: £4.5m

Procurement: Competitive Tender

Project Overview

Total Regen, in collaboration with St. Modwen, was entrusted with the responsibility of managing the design and construction of Mease Spencer Academy. This new, single-storey primary school is located in Hilton, Derbyshire. The project came into existence as part of a planning agreement between St. Modwen and South Derbyshire District Council. St. Modwen had been commissioned by the council to construct 485 new homes in the village.

The need for Mease Spencer Academy arose from the fact that the existing Hilton Primary School had become oversubscribed. As a result, there was a pressing requirement for a new school in the area to accommodate the growing number of students. Mease Spencer Academy proudly stands as the 7th successful construction project delivered by Total Group in partnership with St. Modwen.

This collaboration has been instrumental in transforming the educational landscape of the region. The school is an integral part of the Spencer Academies Trust, a highly regarded multi-academy trust (MAT) known for its exceptional performance. The trust oversees a network of primary and secondary schools across the East Midlands, ensuring that students receive a high-quality education. At Mease Spencer Academy, we are committed to providing a nurturing and stimulating environment for our students.

Our dedicated team of experienced educators is passionate about helping each child reach their full potential. We believe that every student deserves an excellent education and the opportunity to thrive academically, socially, and emotionally. The design of the school has been carefully planned to create a conducive learning environment. The single-storey layout allows for easy navigation and accessibility, ensuring that students can move around the school safely and comfortably.

The spacious classrooms are equipped with modern technology and resources to support interactive and engaging teaching methods. In addition to academic excellence, we also emphasise the importance of holistic development. Mease Spencer Academy offers a range of extracurricular activities and sports facilities to encourage physical fitness and foster a sense of teamwork and camaraderie among students.

We believe in nurturing well-rounded individuals who are not only academically proficient but also possess strong character traits and values. Our partnership with St. Modwen has been instrumental in bringing this vision to life. Their expertise in construction and development has ensured that the school is built to the highest standards of quality and safety. We are grateful for their commitment to creating exceptional educational spaces that positively impact the lives of students and the community as a whole.

As part of the Spencer Academies Trust, Mease Spencer Academy benefits from the collective expertise and resources of the trust’s network of schools. This enables us to share best practices, collaborate on professional development opportunities, and provide a seamless educational journey for our students from primary to secondary school.

We are proud to be a part of the Hilton community and look forward to serving the educational needs of the area for years to come. Mease Spencer Academy is not just a school; it is a place where young minds are nurtured, talents are discovered, and dreams are realised. Join us on this exciting journey of learning and growth at Mease Spencer Academy.

The Total Group Solution

Community engagement

Prior to works starting on site, letters were sent to nearby businesses and residents informing them of the works that would soon be taking place and inviting any comments and concerns to be directed to the site manager. Regular communication was maintained throughout the project.

During the project, we visited Fairfax Academy secondary school in Sutton Coldfield where our assistant site manager delivered a presentation to students looking to pursue a career in construction as part of a wider careers event hosted by the academy. We also delivered a site safety talk to students attending the existing Hilton Primary School.

We worked with the new school’s headteacher to host a guided tour of the school a few weeks prior to practical completion. This was attended by representatives from Derbyshire County Council as well as teaching/ administrative staff and parents.

Reducing our environmental impact

Local supply chain: Where possible, materials were sourced locally in order to reduce travel distances and accompanying carbon emissions. Local subcontractors and suppliers were employed on the project, with 30% of subcontractors based in Derbyshire, and 60% based within a 30-mile radius. Local shops and cafes were also used throughout the build. Any spare timber was saved and donated to local families, encouraging re-use and recycling and reducing project-specific waste throughout the build.

Monitoring of badger sett: Ecological surveys undertaken prior to start on site revealed an active badger sett near to site. Total Group installed barrier fencing around the site perimeter to help ensure the protection of the badgers whilst works were taking place. Throughout the project, we effectively managed our construction activities to ensure heavy machinery was prohibited from being used anywhere near the flagged badger areas.

On-time and budget completion

The new Mease Spencer Academy was completed on budget and in time to welcome its first pupils in September 2019. It features seven classrooms, a sports hall, library, football pitch, and an all-weather multi-use games area, and will cater for pupils aged from five to ten years of age. Underfloor heating runs throughout the school and each classroom has a feature wall painted in one of the school’s own colours, lending a cosy, friendly feel to the new building.

As part of the project, we installed 80m2 of photovoltaic panels on the school’s roof, generating approximately 295W of solar energy.

PROJECT ACHIEVEMENTS

ON TIME AND BUDGET COMPLETION – the new Academy was completed on budget and in time to welcome its first pupils in September 2019

USE OF RENEWABLE TECHNOLOGIES – As part of the project, we installed 80m2 of photovoltaic panels on the school’s roof, generating approximately 295W of solar energy

LOCAL SUPPLY CHAIN – Local subcontractors and suppliers were employed on the project, with 30% of subcontractors based in Derbyshire, and 60% based within a 30-mile radius

MANAGING ENVIRONMENTAL CONSTRAINTS – Ecological surveys undertaken prior to start on site revealed significant badger, bird and bat activity on and near to site. Total Group ensured the protection of all species through keeping heavy machinery away from flagged areas as well as installing Tree Root Protection measures around three veteran oak trees on site

Airfield Business Park

Total Group has been appointed by the council to construct a range of high-spec steel frame industrial units at Airfield Business Park, located just outside Market Harborough. These units, ranging from 1,570 to 33,360 sq. ft, will provide additional space for businesses in the area.

Intensive Support Unit

In 2012, the trust appointed Total Group as the principal contractor for the construction of a new and advanced Intensive Support Services Unit (ISSU) on Firshill Rise, Sheffield. This project aimed to provide a state-of-the-art facility to cater to the needs of the community and bed-based service users.

West Bromwich Building Society

Total Group were successful in securing the design, supply and installation works for the Mechanical and Electrical (M&E) services on the new West Bromwich Building Society Head Office in West Bromwich. The building society was looking for a reliable and sustainable solution 

Lakeside Student Accommodation

During the summer of 2019, Total Group had the honor of being appointed to undertake a comprehensive £4.8m refurbishment scheme at Warwick’s Lakeside House student accommodation. This ambitious project involved the renovation of 304 bedrooms and en-suite bathrooms, along with the revitalization of the accompanying communal areas.

Dunelm Store Nottingham

Total Group is proud to have been appointed to undertake the design and build of Dunelm’s new 23,000 sq. ft. Nottingham branch. Our team of experienced professionals is committed to delivering a high-quality project that meets Dunelm’s specific requirements and exceeds their expectations.

Nottingham Fire Station

The Nottinghamshire Fire and Rescue Service (NFRS) recognised the need for a new base that would cater to the requirements of a modern fire station. After careful consideration, the London Road fire station was proposed as the ideal location, offering energy efficiency, convenience for emergency call-outs

Shirebrook Enterprise

In 2011, the council of Shirebrook entrusted Total Group with the task of designing and constructing a state-of-the-art Enterprise Centre. This flagship project aimed to provide a mix of office and workshop units specifically tailored for small and medium-sized enterprises (SMEs)

Nottingham College

Since their construction in the 1970s, several of the original Vision West Nottinghamshire College campus buildings had developed a number of issues, including generating high utility bills, as well as suffering extremes of solar gain and heat loss through existing single glaze windows.

Hartons Industrial Estate

In 2018, Total Group was entrusted by Hortons’ to oversee the design and construction of Asparagus Point, a state-of-the-art industrial development spanning 54,450 square feet. This project marked the latest addition to the esteemed Vale Park industrial estate in Evesham.

Aspley Academy

At Bluecoat Academy and 6th Form College in Nottingham, we are proud to announce the expansion of our facilities to accommodate the growing number of students and enhance their educational experience. As a result of the increased student numbers and academic achievements, 

Barnsley College

In 2014, our college embarked on an exciting journey to enhance its sport and public services facilities. Thanks to the support of the Skills Funding Agency’s (SFA) College Capital Investment Fund (CCIF), we secured £4 million in funding for this ambitious project

Distribution Centre Construction

Three years after collaborating with Total Group’s construction and engineering teams to establish a state-of-the-art design studio in Mansfield, Linney has once again entrusted Total Group with the responsibility of managing the construction of a new, purpose-built warehouse.

Ramberley Development

Hamberley is a renowned developer of specialist care facilities in the United Kingdom. With a commitment to providing exceptional care environments, Hamberley has partnered with Total Group to manage the design and construction of various projects.

Spencer Academy

Total Group, in collaboration with St. Modwen, was entrusted with the responsibility of managing the design and construction of Mease Spencer Academy. This new, single-storey primary school is located in Hilton, Derbyshire. The project came into existence as part of a planning agreement between St. Modwen 

Chawley Grove Care Home

Chawley Grove Care Home, a luxurious and state-of-the-art residential care facility located in the picturesque village of Cumnor, Oxfordshire. Designed and built by Total Group, renowned experts in specialist care schemes, Chawley Grove offers exceptional care and a comfortable living 

Littlecombe Industrial Units

In 2017, our company entrusted Total Group with the responsibility of managing and delivering the design and construction of nine structural steel portal frame industrial units. This project was part of a larger mixed-use regeneration scheme in the Dursley area, located near the town centre. 

One partner, endless solutions

Let's Build Together

To get started, for general enquiries simply complete the form below. Provide us with your project details, and our team will review your requirements. We will then get back to you with a customised solution that fits your needs. Whether you have a small-scale project or a large-scale development, we have the expertise and resources to handle it. Once we have received  your submission, you will receive a confirmation email (Please check all your email boxes)

If you prefer, and have a project in mind and seeking a price you can also send us your project documents and any photographs directly to Price@totalregen.co.uk. We will carefully examine your documents and provide you with a competitive quote together with a timescale from inception through to completion for your project.

 

Let’s discuss your project

0330 043 3177

Follow Us

© All rights reserved you must not copy any content on this website without the written consent of the Total Holdings Group

Part of the Total Holdings Group

error: Content is protected !!
Scroll to Top