GMB UNNION CONSTRUCTION

At Total Regen, we take pride in our ability to undertake extensive external and internal refurbishment projects. Recently, we were entrusted with the task of refurbishing the existing GMB building on Newport Road, Cardiff. This project presented unique challenges due to its location on one of the busiest streets in the city. To ensure the safety of the public and an efficient build process, we implemented a comprehensive health and safety plan.

Project details:

Client:  GMB Union, Cardiff

Team:  Total Group

Type: JCT Design & Build Contract

Location: Carmarthen

Project value: £7,900,000

Procurement: Competitive Tender

Project Overview

Scheme Overview: At Total Regen, we were entrusted with the task of undertaking extensive external and internal refurbishment of the existing GMB building on Newport Road, Cardiff. Situated on one of the busiest streets in Cardiff, this project required a focused and fully coordinated management plan to ensure the safety of the public and an efficient build process. With our experience and expertise, we implemented a comprehensive health and safety plan to address all potential risks and access issues throughout the course of the scheme.

Our priority was to safeguard members of the public while maintaining a smooth construction process. One of the key challenges of this project was managing the high traffic volume on Newport Road. We carefully planned all deliveries and construction-related traffic movements to avoid peak hours and high-risk periods. This proactive approach allowed us to minimise disruptions to the flow of traffic and maintain a safe environment for both pedestrians and motorists.

To optimise the use of space, we utilised the existing rear car park area for material storage. This strategic decision allowed us to efficiently manage the distribution of materials to each floor level. Through the use of a hoist, we ensured a streamlined process, reducing the time and effort required for manual transportation. Our team of skilled professionals worked diligently to execute the refurbishment project to the highest standards. We paid meticulous attention to detail in both the external and internal aspects of the building.

From repairing and repainting the exterior facade to upgrading the interior spaces, our goal was to transform the GMB building into a modern and aesthetically pleasing structure. The external refurbishment included repairing any damages, applying a fresh coat of paint, and enhancing the overall appearance of the building. We carefully selected materials that would withstand the test of time and improve the durability of the structure. Our team of experts ensured that the building’s exterior not only looked visually appealing but also provided long-term protection against weather elements. Internally, we focused on creating functional and comfortable spaces.

We addressed any structural issues, upgraded electrical and plumbing systems, and installed modern fixtures and fittings. Our aim was to provide a conducive environment for the occupants of the building, whether they were employees or visitors. Throughout the entire refurbishment process, we maintained open lines of communication with our client, the GMB. We understood the importance of collaboration and regular updates to ensure that the project was progressing according to their expectations.

Our team was responsive to any concerns or queries raised by the client, and we strived to address them promptly and effectively. At Total Group, we take pride in our commitment to delivering high-quality results. We understand the significance of refurbishment projects in revitalizing existing structures and creating spaces that meet the evolving needs of our clients. With our expertise in project management and attention to detail, we were able to successfully transform the GMB building on Newport Road, Cardiff into a modern and functional space. If you have any questions or would like to discuss your own refurbishment project, please don’t hesitate to get in touch. Our team is ready to assist you in bringing your vision to life

Project challenges and resolutions

Undertaking extensive external and internal refurbishment of the existing GMB building on Newport Road, Cardiff presented several challenges that needed to be addressed. Situated on one of the busiest streets in Cardiff, this project required a focused and fully coordinated management plan to ensure the safety of the public and an efficient build process. With our experience and expertise, we implemented a comprehensive health and safety plan to address all potential risks and access issues throughout the course of the scheme.

Public Safety

One of the primary concerns during the refurbishment project was the safety of the public. With the building located on a bustling street, it was essential to implement measures that would minimize any potential risks to pedestrians and road users. Our team conducted a thorough assessment of the site and developed a detailed plan to ensure that all safety precautions were in place.

We established clear barriers and signage to redirect pedestrians away from the construction zone and created safe pathways for them to navigate around the site. Additionally, we coordinated with local authorities to manage traffic flow and minimize disruptions to the surrounding area. Regular safety inspections and ongoing communication with the public ensured that everyone was aware of the construction activities and any necessary precautions.

Access Challenges

Another significant challenge of refurbishing the GMB building was the limited access to the site. Being located on a busy street meant that there were restrictions on the movement of construction vehicles and the delivery of materials. To overcome this challenge, we devised a logistics plan that optimized the use of available space and minimized disruptions to traffic.

We scheduled deliveries during off-peak hours to reduce congestion and coordinated with local authorities to obtain permits for temporary road closures when necessary. Our team also employed innovative solutions such as using smaller vehicles for deliveries and utilizing nearby parking areas for staging materials. By carefully planning and coordinating access, we were able to ensure a smooth flow of construction activities while minimizing disruptions to the surrounding area.

Health and Safety

Ensuring the health and safety of everyone involved in the project was of utmost importance. We implemented a comprehensive health and safety plan that covered all aspects of the refurbishment process. This included regular risk assessments, safety training for workers, and the use of appropriate personal protective equipment.

We also established clear communication channels between the construction team and the client to address any safety concerns promptly. Regular site inspections and audits were conducted to identify and rectify any potential hazards. By prioritizing health and safety throughout the project, we created a secure working environment for our team and ensured the wellbeing of all stakeholders.

Efficiency and Coordination

To ensure an efficient build process, we focused on effective coordination and communication among all parties involved. This included regular meetings with the client, architects, and subcontractors to discuss progress, address any challenges, and make necessary adjustments to the project plan.

We employed project management tools and software to track and monitor progress, ensuring that all tasks were completed on time and within budget. By maintaining open lines of communication and fostering a collaborative environment, we were able to overcome obstacles and keep the project on track.

Conclusion

Undertaking the extensive refurbishment of the GMB building on Newport Road, Cardiff presented various challenges. However, with our experience, expertise, and comprehensive management plan, we successfully addressed these challenges and delivered a high-quality refurbishment while prioritizing public safety, efficient access, health and safety, and effective coordination.

Our commitment to excellence and our ability to navigate complex projects make us the ideal partner for any refurbishment endeavor. Contact us today to discuss how we can assist with your next project.

MOXY HOTEL

We have been contracted to build the £8.65m Moxy Boutique Hotel in Bristol City Centre. This exciting new development will play a key part in the continued regeneration plans for the city, next to its flagship retail and leisure development, Cabot Circus.

HAPPY BEES, MANCHESTER

We are proud to be part of this notable scheme, which includes the construction and fit-out of six nursery buildings across the North West of England. Our team at Total Group was entrusted with the responsibility of completing the build 

WAITROSE, WARMINSTER

The design and construct scheme incorporated the demolition of the existing factory in order to facilitate the construction of the Waitrose store which included associated parking, service yard and comprehensive Section 278 works to the surrounding roads.

PARC PLAZA, BRIDGEND

Dovey Estates is a Cardiff-based commercial developer. Total Regeneration was contracted to build 63,000 ft² of retail outlet on Parc Plaza, a popular commercial development on the outskirts of Bridgend. The units were delivered ahead of schedule and are now occupied

STARBUCKS DRIVE-THRU, NEWPORT ROAD, CARDIFF

The development was carried out in one phase consisting of a one storey steel frame building with a small seated restaurant and external car parking. Various external finishes were applied to the building including face brick plinth through colour render. 

GMB UNION

Situated on Newport Road arguably the busiest street in Cardiff, this project necessitated a focused and fully co-ordinated management plan for all health and safety and access issues throughout the course of the scheme, in order to safeguard members of the public and ensure an efficient build process.

J D WETHERSPOON, NEWTOWN

The substantial refurbishment of the 17th century, grade II listed building included asbestos removal, substantial demolitions to rear areas, a new rear and first floor extension, new floor, wall and ceiling finishes throughout, complete renewal of the mechanical and electrical 

PREMIER INN, BEEFEATER RESTAURANT, TESCO EXPRESS, SWANSEA

Brief description of the scheme: Total Regeneration was contracted to build a 132 bedroom Premier Inn Hotel, a Whitbread Restaurant and a Tesco Express on Langdon Road, Swansea. 

Ready to start your project ?

Let's Build Together

To get started, for general enquiries simply complete the form below. Provide us with your project details, and our team will review your requirements. We will then get back to you with a customised solution that fits your needs. Whether you have a small-scale project or a large-scale development, we have the expertise and resources to handle it. Once we have received  your submission, you will receive a confirmation email (Please check all your email boxes)

If you prefer, and have a project in mind and seeking a price you can also send us your project documents and any photographs directly to Price@totalregen.co.uk. We will carefully examine your documents and provide you with a competitive quote together with a timescale from inception through to completion for your project.

 

Let’s discuss your project

0330 043 3177

Follow Us

© All rights reserved you must not copy any content on this website without the written consent of the Total Holdings Group

Part of the Total Holdings Group

error: Content is protected !!
Scroll to Top