WEST BROMWICH BUILDING SOCIETY – NEW HEAD OFFICE M&E WORKS

Total Regen was successful in securing the design, supply and installation works for the Mechanical and Electrical (M&E) services on the new West Bromwich Building Society Head Office in West Bromwich. The building society was looking for a reliable and sustainable solution that would provide back-up in the event of a power outage.

Project details:

Client:  West Bromwich Building Society

Team:  Total Group

Type: JCT Design & Build Contract

Location: West Bromwich

Project value: £4.8m

Procurement: Competitive Tender

Project Overview

Total Regen were successful in securing the design, supply and installation works for the Mechanical and Electrical (M&E) services on the new West Bromwich Building Society Head Office in West Bromwich. The building society was looking for a reliable and sustainable solution that would provide back-up in the event of a power outage.

The Total Regen approach

Total Regen successfully delivered the design and installation of a large, complex data centre and chiller plant, energy efficient and sensory lighting throughout, and all building services to kitchens, bathrooms and washrooms. State-of-the-art ventilation and control systems were implemented in order to minimise energy consumption.

To ensure the building is able to remain operational during a power outage, the six-storey headquarters also required the installation of a UPS (Uninterruptable Power Supply) system and two twin back-up generators.

Raised access floors were implemented throughout the building to allow power bus-bars and data cabling to suit the diverse range of office layouts.

The building now occupies over 500 people and boasts significantly improved facilities for both the client’s employees and their customers. The sustainable solutions implemented led to a BREEAM rating of ‘Very Good’, which will help West Bromwich Building Society increase market value, lower operating costs, and contribute to the well-being of the environment.

PROJECT ACHIEVEMENTS

POWER OUTAGE PROTECTION – Total Group installed an Uninterruptable Power Supply system and two twin back-up generators

LOCAL REGENERATION – the new office joins various other new buildings that have helped to regenerate the town centre in recent years

BREEAM ‘VERY GOOD’ RATING – the building has achieved a BREEAM rating of ‘Very Good’ due to its numerous energy-saving features

INTEGRATED SOLUTIONS – since handover, Total Group’s Facilities Management team successfully secured the ongoing maintenance contract for the site

Airfield Business Park

Total Group has been appointed by the council to construct a range of high-spec steel frame industrial units at Airfield Business Park, located just outside Market Harborough. These units, ranging from 1,570 to 33,360 sq. ft, will provide additional space for businesses in the area.

Intensive Support Unit

In 2012, the trust appointed Total Group as the principal contractor for the construction of a new and advanced Intensive Support Services Unit (ISSU) on Firshill Rise, Sheffield. This project aimed to provide a state-of-the-art facility to cater to the needs of the community and bed-based service users.

West Bromwich Building Society

Total Group were successful in securing the design, supply and installation works for the Mechanical and Electrical (M&E) services on the new West Bromwich Building Society Head Office in West Bromwich. The building society was looking for a reliable and sustainable solution 

Lakeside Student Accommodation

During the summer of 2019, Total Group had the honor of being appointed to undertake a comprehensive £4.8m refurbishment scheme at Warwick’s Lakeside House student accommodation. This ambitious project involved the renovation of 304 bedrooms and en-suite bathrooms, along with the revitalization of the accompanying communal areas.

Dunelm Store Nottingham

Total Group is proud to have been appointed to undertake the design and build of Dunelm’s new 23,000 sq. ft. Nottingham branch. Our team of experienced professionals is committed to delivering a high-quality project that meets Dunelm’s specific requirements and exceeds their expectations.

Nottingham Fire Station

The Nottinghamshire Fire and Rescue Service (NFRS) recognised the need for a new base that would cater to the requirements of a modern fire station. After careful consideration, the London Road fire station was proposed as the ideal location, offering energy efficiency, convenience for emergency call-outs

Shirebrook Enterprise

In 2011, the council of Shirebrook entrusted Total Group with the task of designing and constructing a state-of-the-art Enterprise Centre. This flagship project aimed to provide a mix of office and workshop units specifically tailored for small and medium-sized enterprises (SMEs)

Nottingham College

Since their construction in the 1970s, several of the original Vision West Nottinghamshire College campus buildings had developed a number of issues, including generating high utility bills, as well as suffering extremes of solar gain and heat loss through existing single glaze windows.

Hartons Industrial Estate

In 2018, Total Group was entrusted by Hortons’ to oversee the design and construction of Asparagus Point, a state-of-the-art industrial development spanning 54,450 square feet. This project marked the latest addition to the esteemed Vale Park industrial estate in Evesham.

Aspley Academy

At Bluecoat Academy and 6th Form College in Nottingham, we are proud to announce the expansion of our facilities to accommodate the growing number of students and enhance their educational experience. As a result of the increased student numbers and academic achievements, 

Barnsley College

In 2014, our college embarked on an exciting journey to enhance its sport and public services facilities. Thanks to the support of the Skills Funding Agency’s (SFA) College Capital Investment Fund (CCIF), we secured £4 million in funding for this ambitious project

Distribution Centre Construction

Three years after collaborating with Total Group’s construction and engineering teams to establish a state-of-the-art design studio in Mansfield, Linney has once again entrusted Total Group with the responsibility of managing the construction of a new, purpose-built warehouse.

Ramberley Development

Hamberley is a renowned developer of specialist care facilities in the United Kingdom. With a commitment to providing exceptional care environments, Hamberley has partnered with Total Group to manage the design and construction of various projects.

Spencer Academy

Total Group, in collaboration with St. Modwen, was entrusted with the responsibility of managing the design and construction of Mease Spencer Academy. This new, single-storey primary school is located in Hilton, Derbyshire. The project came into existence as part of a planning agreement between St. Modwen 

Chawley Grove Care Home

Chawley Grove Care Home, a luxurious and state-of-the-art residential care facility located in the picturesque village of Cumnor, Oxfordshire. Designed and built by Total Group, renowned experts in specialist care schemes, Chawley Grove offers exceptional care and a comfortable living 

Littlecombe Industrial Units

In 2017, our company entrusted Total Group with the responsibility of managing and delivering the design and construction of nine structural steel portal frame industrial units. This project was part of a larger mixed-use regeneration scheme in the Dursley area, located near the town centre. 

Ready to start your project ?

Let's Build Together

To get started, for general enquiries simply complete the form below. Provide us with your project details, and our team will review your requirements. We will then get back to you with a customised solution that fits your needs. Whether you have a small-scale project or a large-scale development, we have the expertise and resources to handle it. Once we have received  your submission, you will receive a confirmation email (Please check all your email boxes)

If you prefer, and have a project in mind and seeking a price you can also send us your project documents and any photographs directly to Price@totalregen.co.uk. We will carefully examine your documents and provide you with a competitive quote together with a timescale from inception through to completion for your project.

 

One Partner, Endless Solutions

error: Content is protected !!
Scroll to Top