Project details:
Client:Â Lincolnshire County CouncilÂ
Team:Â Total Regen
Type: New Build
Location: Witham St. Hughs, Lincolnshire
Project value: £1,000,000
Procurement: empa ii Framework
Project Overview
Working within a live site in a new residential area, we undertook the construction of a predominantly timber framed extension to the existing school. The extension was added to provide additional classroom space (an additional 90 places) and a staffroom for the OFSTED outstanding rated academy.
The project was procured through the empa ii Framework which has a core focus on collaboration.
The new alterations complement the academy’s design to be child friendly with a variety of colours, textures and shapes used in the design. The windows have been positioned to make the most of the surrounding views and are set at appropriate heights for the children.
Our site manager also carried out regular walk-throughs of the site when it was nearing completion with both the head teacher, and teachers who would be using the classrooms, to ensure that fixtures such as white boards and notice boards were placed where they wanted for their classroom set-up.
The Challenge
This was an incredibly complex site, due to the narrow entrance and access restrictions, timber frames had to be lifted on to the site via a crane from a flatbed trailer parked outside of the site. No plant moved through the school at any time for safety of staff and students.
The site had just one entrance which is very narrow, meaning logistics could be challenging for large items being delivered.
Due to access restrictions, one of the biggest concrete pumps in the UK had to be brought up all the way from Heathrow by the groundworks contractors. The concrete pump was then set up in the playground outside of school hours, in order to pump concrete over the roof of the school for the pour of the floors.
As the school was still active, the team scheduled works with heavy machinery to take place during half-terms, evenings and weekends to minimise disruption. A full time gatesman was employed whenever mud or concrete were being carted into/out of site during school hours to ensure none of the children wandered in to the site.
The site was fenced off with the appropriate signage displayed, Health & Safety procedures were strictly adhered to, all site warning, health & safety signs were well displayed, waste management procedures were put in place by means of separating materials that could be recycled or used elsewhere within the project, limiting overall waste from the site.
Outcomes:
During the course of the project, the delivery team set up a food donation box on-site in support of the local Lincoln Foodbank, resulting in a positive impact on the lives of vulnerable people in Lincoln. A Macmillan bake sale was also held during parent’s evening, raising £75 for the charity.
Our site manager provided the school children with deprecated site plans and technical drawings for use during classes – this gave the children an idea of the planning that went into the building, and also gave them the opportunity to draw on their own additions.
Site visits for several classes and groups of school children were organised during the project in order to inspire and educate the next generation.
The site team also got involved in the school sports-day, with sub-contractors taking part in a sack race, which proved really popular with the children.




Ready to start your project ?
Rushcliffe School
A new build, design and build, 2,200m2 Performing Arts and Languages Building at the Ofsted Outstanding school.
Witham St. Hughs Academy
Working within a live site in a new residential area, we undertook the construction of a predominantly timber framed extension to the existing school.Â
Research Acceleration Demonstration Building
Known as the Research Acceleration and Demonstration (RAD) building, the 2500m2 centre, is being delivered on the University of Nottingham’s Jubilee Campus,Â
Bishop Grosseteste University Phase 1
A significant element of the project was the installation of new structural steel to open up the building by removing structural walls.Â
De Montfort University – Castle Hall Business School
The team behind the transformation of Leicester Castle into a leading business school have described the challenge and excitement of bringing such a historic building back to life. Â
Loughborough University – Multi Faith Centre
Refurbishment and remodeling of the Edward Herbert Building first floor at Loughborough university saw Woodhead deliver :Â a Christian Chapel, Multi-faith prayer rooms, male and female Muslim prayer rooms.
ST JOHNS COLLEGE, CARDIFF
A St John’s College is an independent day school for boys and girls aged 3 to 18. This project involved the construction of a new extension for the provision of new classroom space and library facilities.
Â
BRYNCETHIN PRIMARY SCHOOL, BRIDGEND
Total Regeneration has an unrivalled understanding of planning and development opportunities nationwide, including local knowledge of the long term, publicly funded development areas
Committed to Excellence at all levels
Let's Build Together
Please complete the form below and someone from the Total Regeneration team will be in touch.