Project Overview

Scheme Overview: 46 Apartments at Customs House, Talbot Road, Port Talbot.

The project involved the demolition of the existing 2, 3 and 4 storey buildings which completely covered the development site area and consisted of retail units and workshops to the ground floor with office space above.

The site parcel was completely surrounded by busy access roads, with B roads and an access lane on 3 sides and the south elevation of the site bounded by the busy main road leading through Port Talbot to Margam and the steelworks. The ground floor of the new building was constructed in structural steel frame and utilised a composite concrete transfer deck above to provide the base for the 2,3 and 4 storey timber frame flats.

By designing the structure in this manner, it facilitated a flexible layout option to the new GF retail space, allowing it to be subdivided into different sizes and shapes to suit potential customer preference thus maximising leasing potential. The timber frame provided a relatively lightweight super structure when considered to more traditional masonry options, and with the quick installation time allowing the flat roofing to be installed, the building was watertight and ready for internal finishes to commence at the earliest opportunity.

Challenges: 

  • Due to the age of the existing buildings there was an extensive asbestos removal operation required prior to commencing demolition.
  • The proximity of existing residential units in respect to the site perimeter necessitated the use of enhanced flame spread considerations for the timber frame element.
  • Due to the confined nature of the site and the building dimensions, careful consideration in planning and scheduling the delivery of plant and materials was required, with elements being brought to site on a ‘just in time’ basis due to site constraints.

Subway Road

We are building this scheme on behalf of Wales & West Housing Association. The development consists of two apartment blocks with a mixture of 1 and 2 bedrooms. There are 40 units in block 1 and 32 units in block 2.

Coed Housing Project

We are building a collection of 2, 3 and 4 bedroom family homes on behalf of Candleston Homes. There will be a total of 51 properties designed to meet the needs of contemporary living, each home offers a spacious and stylish layout, 

Maelfa Regeneration

Total Regeneration have teamed up with Cardiff Community Housing Association (CCHA) and Cardiff Council to give Llanedeyrn a much-needed regeneration scheme. The old Maelfa shopping centre had become very much dated

Springfield Road Housing

Total Regeneration was contracted to build 40 affordable homes made up of different sized houses and flats. The project involved strip foundations, block and beam floors, timber frame superstructure and floors, pitched concrete tile roofs with face brickwork, render and cladding

Rumpoles Cardiff

Total Regeneration constructed with timber frame over five storeys which was sub-divided and serviced via three separate core areas with lifts and staircases. The façade was a mixture of brick and render finish with a rotunda for the central section. 

Grigy Wron Housing

The partial demolition, refurbishment and conversion of the former Victorian primary school, Graig y Wion, into 28 new residential units. Fifteen apartments have been provided within the two three-storey new builds, three in bungalows, whilst 10 apartments were housed 

Close Park Development

Total Regeneration were contracted to build 35 residential units consisting of 18 flats spread over 2 blocks, each with 3 floors and containing 9 flats along with communal staircase along with 17 houses. 

Liberty Court

The development, programmed over a 15 month period, consisted of 32 new apartments for the over 55s, a community library and substantial commercial space which is available for rent to local businesses and community groups. 

Royal Building Port Talbot

The project involved the demolition of the existing 2, 3 and 4 storey buildings which completely covered the development site area and consisted of retail units and workshops to the ground floor with office space above. 

Passivhaus

We are building this scheme on behalf of Linc Cymru Housing Association, the development will consist of; 34 flats and 4 general needs mid terrace houses. The development will also include an outdoor fitness area and edible elements within the landscaping to further improve residents’ health.

NPT Developments

The project was constructed via a design and build contract and drew extensively on Total Regenerations’s expertise stretching across a variety of renewable technologies. The steel frame, three storey building had an extensive collection of sustainable features including ground source heat pumps, solar thermal 

Rugby Club Community Facility

The new building which was built on the site of the former Salisbury Hotel in Ferndale has been constructed as a community facility for Rhondda Life and also doubles as the clubhouse for Ferndale RFC. The building contains three function rooms and three bar areas.  A pre-demolition assessment of the existing Salisbury Hotel was carried out

Ready to start your project ?

Committed to Excellence at all levels

0 %
Satisfied clients
0 %
Projects completed on time
0 %
Projects completed on budget
0 %
Repeat business

You Dream...We Design & Build

Let's Build Together

Please complete the form below and someone from the Total Regeneration team will be in touch.

Let’s talk

0333 5330 032

DIVISIONS

INDUSTRIES

Follow Us

©2012-2022 All rights reserved you must not copy any content on this website without the written consent of the Total Regeneration Group

Part of the Total Regeneration Group

Scroll to Top