Research Acceleration Demonstration Building

This project combines the sustainability measures of BREEAM (Building Research Establishment Environmental Assessment Method), and Passivhaus. BREEAM is used as a way of measuring how sustainable a building can be, as well as enhancing the health and wellbeing of its end users. The Passivhaus construction method provides buildings with a high level of comfort for its users, while using very little energy for heating and cooling. Structures are built with meticulous attention to detail and rigorous design and construction according to principles developed by the Passivhaus Institute in Germany.

Project details:

Client:  University of Nottingham

Team:  Total Regen

Type: New Build (Sustainable)

Location: Nottingham

Project value: £5,900,000

Procurement: Competitive Tender

Project Overview

Known as the Research Acceleration and Demonstration (RAD) building, the 2500m2 centre, is being delivered on the University of Nottingham’s Jubilee Campus, within the innovation park. When completed it will provide state-of-the-art facilities for research and testing as part of the Energy Research Accelerator initiative.

The project is part of the Energy Research Accelerator collaboration (ERA) and is an Innovate UK funded initiative. The collaboration combines the research expertise of the six Midlands Innovation universities and the British Geological Survey (BGS) with the know-how of industry, to deliver a step change in energy innovation.

The highly sustainable building will house many of the UK’s leading academics, who will work together with business to accelerate the introduction of new technologies in the energy sector. The RAD building will include laboratory space for research ranging from harvesting and storing wind energy, to the development of new materials for hydrogen storage. In addition, there will be office space for researchers, and a central atrium with breakout spaces where ideas can be discussed and explored.

Sustainability

The RAD building will be one of the first research centres in the UK to combine the rigorous sustainability standards of BREEAM with the principles of the German PassivHaus approach. PassivHaus is based on the creation of a building with excellent insulation and a high level of airtightness, in which air quality is maintained via a whole building mechanical ventilation system.

What makes this development so pioneering is the combination of both the BREEAM (Excellent) and PassivHaus Standards.  Within the UK there is only approximately 35,000m2 of commercial Passivhaus developments and an even smaller amount of BREEAM PassivHaus development. We will be working with Building Fabric Engineers, PassivHaus Designers and a BREEAM consultant to ensure both sustainability standards are achieved.

Managing the Interface Between BREEAM and Passivhaus – the two separate assessment tools can provide problems due to conflicting approaches.  In assessing our approach to the RAD building we held a collaborative workshop with both the BREEAM Assessor and our specialist PassivHaus Consultant.  Within the workshop we identified several parallels and unity across the assessment criteria. For example PassivHaus focussed on the airtightness of the envelope and its thermal resistance and is far superior to the BREEAM requirements.  Taking the approach of PassivHaus to energy usage has increased the credits available on BREEAM due to higher performance criteria.

Inspiring the next generation

The architect for the RAD building is Lewis & Hickey (who have kindly provided the CGIs), with BWB acting as structural & civil engineers and CPW as services engineer. AECOM are project managers and Turner & Townsend are the cost managers. We are working closely with Dunkirk Primary School to offer a small group of pupils regular access to the project.  The Nottingham Jobs Hub are supporting us to provide work experience opportunities throughout the project.  The first placement has been successfully completed.

This project is one of only a handful of commercial developments that combines both BREEAM and Passivhaus standards.  A series of seminars and professional development workshops has been planned, the first being delivered during EU Sustainability week.

Ready to start your project ?

Rushcliffe School

A new build, design and build, 2,200m2 Performing Arts and Languages Building at the Ofsted Outstanding school.

Witham St. Hughs Academy

Working within a live site in a new residential area, we undertook the construction of a predominantly timber framed extension to the existing school. 

Research Acceleration Demonstration Building

Known as the Research Acceleration and Demonstration (RAD) building, the 2500m2 centre, is being delivered on the University of Nottingham’s Jubilee Campus, 

Bishop Grosseteste University Phase 1

A significant element of the project was the installation of new structural steel to open up the building by removing structural walls. 

De Montfort University – Castle Hall Business School

The team behind the transformation of Leicester Castle into a leading business school have described the challenge and excitement of bringing such a historic building back to life.  

Loughborough University – Multi Faith Centre

Refurbishment and remodeling of the Edward Herbert Building first floor at Loughborough university saw Woodhead deliver :  a Christian Chapel, Multi-faith prayer rooms, male and female Muslim prayer rooms.

ST JOHNS COLLEGE, CARDIFF

A St John’s College is an independent day school for boys and girls aged 3 to 18. This project involved the construction of a new extension for the provision of new classroom space and library facilities.

 

BRYNCETHIN PRIMARY SCHOOL, BRIDGEND

Total Regeneration has an unrivalled understanding of planning and development opportunities nationwide, including local knowledge of the long term, publicly funded development areas

Committed to Excellence at all levels

0 %
Satisfied clients
0 %
Projects completed on time
0 %
Projects completed on budget
0 %
Repeat business

Let's Build Together

Please complete the form below and someone from the Total Regeneration team will be in touch.

Let’s talk

0333 5330 032

DIVISIONS

INDUSTRIES

Follow Us

©2012-2022 All rights reserved you must not copy any content on this website without the written consent of the Total Regeneration Group

Part of the Total Regeneration Group

Scroll to Top